Chloroform Remediation Site at a Learning Institution

  • Client: Tarrant County College District
  • Location: 5901 Fitzhugh Ave., Fort Worth, Texas
  • Project: Phase I ESAs, Phase II ESAs, Remediation & Closure
  • Manager: Gene Murray, P.G.

W&M has performed environmental assessment, remediation and VCP activities at the Fort Worth Opportunity Center property in Fort Worth, Texas (Site). The Site is approximately 4.5 acres in size and developed with three interconnected buildings. A laboratory and other commercial businesses operated on the Site prior to the Fort Worth Opportunity Center.

The Phase I ESA identified RECs on the site, and consequently W&M performed a Phase II investigation of the property. The assessment identified chloroform and trichloroethene (TCE) in both the soil and groundwater. The contamination was addressed through the TCEQ VCP and active groundwater remediation via enhanced vapor recovery.

Copyright © W&M Environmental Group. All Rights Reserved.

Website development by Atomic Design & Consulting