- Client Poly-Cycle
- Location Palmer, TX
- Project Assessment, Remediation Oversight & Closure
- Manager Heather Woodward & Michael Whitehead
W&M assisted potentially responsible parties (PRP) in the closure of former battery disposal facility in Palmer, Texas. This site contained approximately 20,000 cubic yards of battery casing chips and other battery related waste materials. W&M conducted field investigations to delineate the environmental impacts, developed a site closure acceptable to the TCEQ, prepared plans and specifications to implement closure plan, assisted with selection of remediation contractor, and performed confirmation sampling and regulatory coordination. The remediation plan consisted of a RCRA-type solid waste management unit (SWMU) consolidating on-site waste materials and impacted soils. The SWMU was capped using on-site clay and the site was issued a VCP Final Certificate of Completion. W&M significantly reduces site closure costs by keeping the wastes on site (no off-site disposal) and utilizing Tier II calculations to minimize on-site excavation volumes.
- Client Cable Manufacturer
- Location Plano, Texas
- Project Phase II, Asbestos, Remediation, SWP3, SPCC, Waste & Final Closure
- Manager Michael Whitehead
W&M performed a wide range of environmental services for this former copper wire manufacturer while it was still in operation and after it was shut down and ultimately sold to a real estate investor. W&M provided a full range of environmental services to this facility while it was still in operation including development of their SWP3, SPCC plans, asbestos surveys, Petroleum Storage Tank (PST) management, removal and closure of Leaking PSTs (LPSTs), and general regulatory assistance (e. g., waste classification). Following plant shut down, W&M assisted the client with Phase II sampling, remediation of impacted soil, and closure through the TCEQ Correction Action Program. The Site has been cleaned up and closed and ultimately sold to an investor.
- Client Battery Recycler/Refiner
- Location North Texas
- Project TPDES, SWP3, SPCC, Landfill Design & Closure
- Manager Heather Woodward & Michael Whitehead
W&M has worked on a wide range of projects at a secondary lead smelter in North Texas (hazardous waste Transfer, Storage and Disposal facility). Our work has included Phase II Investigations, remediation of impacted soil, soil sampling to evaluate air monitoring impacts, development of SWP3 plan and annual updates, spill prevention, control and countermeasure (SPCC) plan development, source reduction/waste minimization (SR/WM) plan, assistance with their Environmental Management System (EMS) plan, completion of their TPDES permit, and design and contractor oversight of landfill cell construction.
- Client Cosmetics Manufacturer
- Location Dallas, Texas
- Project In-House EHS, Phase I, Phase II, Remediation, SWP3 & Training
- Manager Heather Woodward
W&M works at this cosmetic manufacturer (hair care products) on a daily basis serving as the in-house Environmental Health & Safety (EHS) manager. Our duties include general regulatory compliance, plant safety, and environmental training. W&M has also conducted a Phase I ESA, Phase II Investigation, remediation, closure through the TCEQ, and development of SWP3 plan for the facility.
- Client Aggregate Supplier
- Location Texas, Louisisana, Arkansas
- Project SWP3 Plans
- Manager Heather Woodward
W&M developed SWP3s for over 100 concrete batch plants and associated aggregate mines across Texas, Louisiana, and Arkansas. Site visits were conducted at each facility over a period of approximately three weeks. In addition, non-compliance issues were also noted and communicated to the Client. SWP3s were developed in accordance with each state’s General Permit. Budget and scheduling goals were achieved by developing report templates for each type of facility and conducting Site visits according to geographical areas.
- Client Law Firm
- Location Multiple Sites in Texas
- Project Phase I, Phase II, Remediation, Enforcement Cases, Regulatory Compliance & Closure
- Manager Nic Andreani & Heather Woodward
W&M has worked on a wide range of projects for a nationally respected law firm and their clients. This work has included real estate due diligence for mergers and aquisitions and regulatory compliance projects. Specific projects have included Phase I ESAs, Phase II Investigations, addressing enforcement issues with the TCEQ, and remediation projects. Working with this law firm required attention to detail and expertise with the fate and transport of potential chemicals of concern in the soil and groundwater.
- Client Aluminum Foundry
- Location Garland, Texas
- Project Compliance and Remediation Services
- Manager Heather Woodward
W&M has worked on a wide range of projects for this aluminum foundry including site sampling, remediation of impacted soil, UST removal and closure, development of SWP3 plans, SPCC plans, implementation of storm water pollution controls, compliance auditing, and Pollution Prevention. W&M has assisted this client in virtually all aspects of their on-going environmental compliance needs. W&M has responded quickly and been an advocate to the client in dealing with the state and local regulatory agencies.