888-798-9754
|
Contact
Project

International Oil-Service Company

Client: International Oil-Service Company
Location: Multiple Sites in Flower Mound and Copper Canyon, Texas
Project:

W&M performed a wide range of environmental services for the pre-acquisition of proposed urban drill sites located in north Texas in the Barnett Shale. W&M completed Phase I Environmental Site Assessments (ESA), Environmental Protection Plans (EPP), Hazardous Materials Management Plans (HMMP), storm water pollution prevention plans (SWP3), Noise Monitoring Plans (NMP), and noise monitoring at the drill sites. Because of variances associated with some of the drill sites and stringent municipal requirements, W&M assisted the client with the review process and public meetings. As a result of our work, many of the drill sites were approved. Additionally, W&M conducted noise monitoring to optimize compressor locations and ensure that their operation met local noise ordinances.

Let's Get Started
Recent Projects
Copyright © 2015–2019 W&M Environmental Group, a Division of Braun Intertec. All Rights Reserved.