Braun Intertec Selected as SWPPP Designer for Wyoming Wind Project

Client: Electric Company
Location: Southern Wyoming
Project: Stormwater Pollution Prevention Plan (SWPPP) Design

Project Description
In early 2019, Braun Intertec was retained as the Stormwater Pollution Prevention Plan (SWPPP or SWP3) designer for ongoing construction of a large wind farm in Wyoming. The project is located on both public and private lands in a remote area of the Rocky Mountain foothills in southern Wyoming. Elevations range from 6,500 to 8,500 feet above mean sea level across the site.

Project Details:
The SWPPP design was performed and completed for 2019 construction, which included primarily a major haul road but also included turbine pad locations and the on-site quarry mined for aggregate used to surface the haul road. Braun Intertec was also retained to perform on-site SWPPP installer training, engineering consultation regarding the configuration of stream crossings, and on-site drainage and SWPPP troubleshooting.

Braun Solutions:
Project challenges that were successfully addressed included tight timeframes for the production of SWPPP designs, steep slopes, regular high winds, and unique seeding and soil stabilization requirements.